426 South Main Street |
|
INSTALLATION DESCRIPTION BRIEF INDUSTRY: IPP (Independent Power Producer) APPLICATION:150 MW Combined Cycle Cogeneration Plant COMMERCIAL OPERATION: February 1993 EAST COAST POWER CAMDEN COGENERATION PLANT Camden, New Jersey, USA OPERATOR: G.E. ENERGY SERVICES EPC CONTRACTOR: EBASCO SERVICES INC DESCRIPTION: 150 MW Natural Gas/Oil Fired, Combined Cycle Cogeneration plant consisting of a single gas turbine generator exhausting into a three pressure Heat Recovery Steam Generator (HRSG) supplying steam to a single condensing steam turbine generator. Plant consists of the following systems that are controlled via the Distributed Control System. Gas Turbine Generator (GE-Frame 7EA) – Limited Control Steam Turbine Generator (General Electric) – Limited Control Heat Recovery Steam Generator (Deltak) Demineralizer System (Glegg) Emissions Control via SCR Ammonia Injection Duct Burner Export Steam System @ 80 KPPH, 350 PSIG Electrical System Monitoring with integral SOE All Balance of Plant Systems – Condensate, Feedwater, Fuels, Mechanical Auxiliaries, etc. CONTROL EQUIPMENT: Leeds+Northrup MAX 1000 DCS with the following components: (2) WorkStations including: (2) Real-Time Processors (2) Applications Processors (EWS) (3) Graphics Processors (OPS) (2) Non-Redundant Distributed Processing Units (DPU’s) (5) Redundant Distributed Processing Unit (DPU’s) Pairs (3) Remote cabinets to handle specific areas of the plant 862 Total I/O Supplied: 150 AI 64 AO 368 DI 160 DO 8 PI 105 TC 7 RTD SPECIAL FEATURES: (2) GE Speedtronics Mark 5 - Modbus Communications Link Allen-Bradley Water Treatment System Datalink Multiplexed Color Copier |