INSTALLATION DESCRIPTION BRIEF INDUSTRY: IPP (Independent Power Producer) APPLICATION: 80 MW Combined Cycle Cogeneration Plant COMMERICAL OPERATION: December 1993 SITHE ENERGIES USA, INC. AG ENERGY, L.P. OGDENSBURG ENERGY FACILITY Ogdensburg, NY, USA EPC CONTRACTOR: ZURN/NEPCO DESCRIPTION: 80 MW Natural Gas/Oil Fired, Combined Cycle Cogeneration Plant consisting of 2 gas turbine generators exhausting into two, three pressure Heat Recovery Steam Generators (HRSG’s) supplying steam to a single condensing steam turbine generator. Plant consists of the following systems that are controlled via the Distributed Control System.
All Balance of Plant System – Condensate, Feedwater, Fuels, Mechanical Auxiliaries, etc.
CONTROL EQUIPMENT: Leeds+Northrup MAX 1000 DCS with the following components:
SPECIAL FEATURES:
|