426 South Main Street |
|
INSTALLATION DESCRIPTION BRIEF INDUSTRY: IPP (Independent Power Producer) APPLICATION: 1200 MW Combined Cycle Cogeneration Plant COMMERCIAL OPERATION: November 2000 ENTERGY POWER GROUP SALTEND COGENERATION FACILITY Kingston-upon-Hull, East Yorkshire, UK EPC CONTRACTOR: RAYTHEON ENGINEERS & CONSTRUCTORS UK, LTD. DESCRIPTION: 1200 MW Natural Gas Fired, Combined Cycle Cogeneration Plant utilizing (3) Gas turbines in a single shaft configuration each with a three (3) pressure HRSG and reheat steam turbine. Steam (up to 190 tons/hour) and electricity will be supplied to the adjacent BP Chemical facility. The following systems are controlled via the Distributed Control System. (3) Single-shaft Gas/Steam Turbines (Mitsubishi 701F2) – Limited Control (3) Generators (GEC Alsthom) (3) Heat Recovery Steam Generators (Austrian Energy & Environment) Steam Header Electrical System Water Treatment System All balance of Plant Systems – Condensate, Feedwater, Fuel Gas, Mechanical Auxiliaries, etc. CONTROL EQUIPMENT: Moore Process Automation Solutions APACS DCS with the following components: Combination of Coax/Fiber Optic Data Highway (4) Dual Screen Operator Stations Single Screen Operator Station Single Screen Supervisor Station Dual Screen Engineering Station Redundant I/O servers Dedicated Historian Server (17) Redundant Advanced Controller Module Pairs (14) Remote cabinets to handle specific areas of the plant. 5552 Total I/O Supplied: 812 AI 404 AO 2428 DI 1028 DO 544 TC 192 RTD 144 PI SPECIAL FEATURES: Integral redundant datalinks to the three (3) MHI turbine control systems, water treatment system, auxiliary boilers, and continuous emissions monitoring (CEMS) system. GPS Time Synchronization |