426 South Main Street |
|
INSTALLATION DESCRIPTION BRIEF INDUSTRY: IPP (Independent Power Producer) APPLICATION: 49.9 MW Fluidized Bed Boiler Cogeneration Plant COMMERCIAL OPERATION: November 1987 NATIONAL POWER CORP PORT OF STOCKTON DISTRICT ENERGY FACILITY Stockton, California, USA EPC CONTRACTOR: SCHNEIDER ENGINEERS
DESCRIPTION: 49.9 MW Waste Coal Fired Cogeneration Plant. Plant consists of the following systems that are controlled via the Distributed Control System. (2) Bubbling Fluidized Bed Boilers (Combustion Power Co.) 50 KPPH, 1500 PSIG, 1000F Steam Turbine Generator (Mitsubishi) – Limited Control Electrical System Monitoring Water Treatment System Combustion Control Export Steam Systems @ 40 KPPH, 175 PSIG All Balance of Plant Systems - Condensate, Feedwater, Circ.Water, Mechanical Auxiliaries, etc. CONTROL EQUIPMENT: Leeds+Northrup MAX 1 DCS with the following components: (2) Operator Stations (2) Operator Station Second Screens (6) Auto Backup Controller File Pairs (2) Single Controller Files (5) Remote cabinets to handle specific areas of the plant 2484 Total I/O Supplied: 420 AI 112 AO 160 TC 100 RTD 1312 DI 480 DO
SPECIAL FEATURES: Boiler Monitoring Console supplied by ACS which includes programmable Recorders One (1) Common Allen-Bradley Data Link to: (2) Flue Gas Baghouses (Research - Cotrell) (1) Ash Handling System and (1) Coal Silo
|