|
5.1 Installation Supervision Monitoring of the instrumentation contractor for installation, wiring, and testing of all I/O devices and system components. 5.2 System Commissioning Initial operation of the system from power up, to testing of I/O into the system for proper operation. On completion of this task the system is ready for process start-up. 5.3 Start-Up Assistance Field verification of system software and standby operation during process start-up to make on-line control system modification during the initial period of process operation. |